Site discipline and structural tolerances
0 mm
framing variance standard
100%
superintendent site presence
48 hr
bid response turnaround


Our framing crews self-perform formwork, load-bearing posts, and shear panels to eliminate sub-trade handover errors. We establish survey datums before rough-ins commence, verifying every plane with digital laser levels.
Site superintendents maintain active digital logs tracking moisture, structural tie-downs, and material delivery tolerances daily. Architects receive unvarnished photo logs of every concealed junction before insulation and drywall close.
Four-phase delivery framework
Drawing audit
Rough-in precision
Envelope testing
Turnkey close-out
We review structural engineering sets and architectural details for mechanical clashes, flashing transitions, and thermal breaks before setting foot on site.
Full-time superintendents oversee all penetrations, backing blocks, and conduit chases, ensuring framing stud integrity remains completely uncompromised.
We test air barriers, window flashings, and rainscreen membranes with water penetration and blower door checks prior to finish cladding.
Final punch lists resolve all reveal gaps, millwork joints, and hardware tolerances against original architectural specifications.
Kelson is the only regional contractor that treats framing tolerances with the same geometric discipline we apply in our CAD models.
David Miller, FAIA, Principal at Miller Hull Collaborative
Submit schematic sets or construction documents for comprehensive line-item pricing and constructability review within forty-eight hours.