


Flagship refit
Structural engineering scope
Steel moment frames inserted into existing framing without disturbing surrounding grade or native forest edge.
4,200 sq ft concrete and cross-laminated timber conversion
Material execution
Uncompromising site discipline, clean job sites, and transparent milestone reporting throughout construction.
Complete seismic stabilization, integrated flush-sill glazing systems, and board-formed interior shear walls executed to zero-millimeter tolerances.






Project archive
Finished elevation and material details
High-resolution documentation covering board-formed concrete, blackened steel stairs, flush-sill doors, and exposed rafters.
Full architectural lookbooks and drawing packages available upon request.
Submit architectural drawings for site review and tender scheduling.
